DESCRIPTION:  In 2008, a new communications tower was constructed at the City of Corvallis Public Works facility.  The tower is a three-legged, self‑supported structure with a maximum height of 150 feet.  Smaller support structures were constructed in the immediate vicinity of the proposed tower.

SERVICE:  Foundation Engineering completed the foundation investigation for the project.  Our scope of work included one exploratory boring to a depth of 61.5 feet, laboratory testing, engineering analyses.  Foundation Engineering completed the investigation within a very tight schedule and provided design and construction recommendations for both mat and drilled shaft foundation options.  Drilled shafts were ultimately selected.  Foundation Engineering also provided observations and on-site consultation during drilled shaft construction.